Decontamination / Decommissioning |
VIASANT performs decontamination and decommissioning activities in former manufacturing facilities across the country. VIASANT provides a turn-key solution for plant shut downs from full facility decontamination to equipment dismantling and removal for shipment to other active facilities.
VIASANT provides the following Decontamination/Decommissioning Services:
-
Chemical Cleaning
-
PCB Decontamination
-
Process Line & Vessel Decontamination/Removal
-
Equipment Decontamination & Dismantling
-
Universal Waste Removal
-
Hazardous Materials Collection & Abatement
-
Lead Abatement
|
| |
| Decontamination / Decommissioning Projects |
| |
 |
 |
 |
| |

|
Battery Manufacturing Plant - West
- Removal of process equipment, production piping and all transfer lines and universal waste
- Select demolition of exterior silos, baghouses, tanks and air handling equipment
- Collection of remaining virgin sulfuric acid and neutralization of the 4” overhead transfer system
- Equipment decontaminated, dismantled and shipped off site to active facilities for reuse
|
| |
 |
Engineering & Training Center - North-East
- Environmental decommissioning of 112,00 square foot facility
- Pre-construction chemical waste and waste materials inventory
- Flushed floor drains, sumps, process trenches, oil/water separators and maintenance pits with flowable grout
- Demolished/dismantled interior structures
- Concrete roof restoration and wall repairs
|
| |
 |
Wire Manufacturing Facility - North-East
- Environmental decommissioning of a manufacturing facility
- HEPA vac removal of solids, and high pressure powerwashing
- Decontaminated and demolished wastewater treatment plant and bulk chemical storage tank farm/equalization tanks
- Waste and decontamination fluids collected and disposed
|
| |
 |
Adhesives Manufacturing Facility - South-West
- Decontamination, demolition and dismantlement activities at a former adhesives manufacturing facility
- Manufacturing equipment decontaminated, dismantled and removed
- Decontaminated interior overhead surfaces of manufacturing areas, transfer pipes and machinery
- Restoration activities included wall and ceiling replacement, floor plate replacement, concrete restoration, and additional decontamination of exterior concrete sections with visual discoloration
|
|
 |
| |
| |