VIASANT has the required resources, expertise and experience to properly execute the implementation of environmental remedial activities for a diverse range of clientele. Soil excavation, waste materials management and site restoration activities are common themes and central components to a number of the environmental remediation projects in VIASANT’s portfolio.
VIASANT provides the following Site Remediation Services:
-
Excavation/Source Removal
-
Onsite Material Management
-
Chemical Fixation Technologies
-
Bulk Waste Transportation, Logistics & Disposal Management
-
Screening & Debris Segregation
|
| |
| Site Remediation Projects |
 |
 |
 |
| |

|
Pharmaceutical Manufacturing Facility - North-East
- Excavation and off-site disposal of As and PaH contaminated soils
- Installation of demarcation fabric, select fill materials and vegetative cover
- Detailed traffic control plan
- Landscape restoration of all disturbed areas
|
|
 |
Porcelain Manufacturing Facility - North-East
- Excavation and offsite disposal of over 8,000 tons of TPH and liquid asphalt impacted soils
- Demolished former boiler building prior to excavation
- Installed over fifty (50) helical piles to a depth of 15 feet bgs
- Performed all excavation services in the “wet” to avoid costly large volume water disposal
- Final restoration of the site included a 1 acre 6” asphalt cap
|
|
 |
Multiple Rail Yards - Mid-West
- Assisted consulting engineer in conducting representative sampling of each site to enable accurate bench scale testing of stabilization reagents
- Mechanically mixed impacted soil with Magnesium Sulfate based stabilizing agent
- All work done without interrupting rail yard operations
|
|
 |
Superfund Site - North-East
- Cd, Cr and Semi Volatile Organic contaminants source removal
- Waste characterization sampling and analysis
- Impacted soil excavation to depths in excess of 21 feet bgs (GW @ 16’18’)
- Over 150 subsurface features, 57,000 tons of Non-Hazardous soils, and 22,000 tons of RCRA hazardous soils removed and shipped off-site
- 70 truck loads of material removed per day
|
|
| |
|
 |
| |
| |